Sheppard Pratt Health Systems Completed comprehensive building HVAC and controls retro-commissioning for the entire campus.
| Scope: |
|
Complete HVAC and Controls Retro-Commissioning |
| Results: |
|
Retro-commissioned with a final operations and energy savings at a simple payback of .75 years at an IRR of 131% |
| |
|
|
Washington & Lee University
Completed comprehensive building HVAC and controls retro-commissioning for the entire campus.
| Scope: |
|
Complete HVAC and Controls Retro-Commissioning |
| Results: |
|
Retro-commissioned with a final operations and energy savings at a simple payback of 1.97 years and an IRR of 54% |
| |
|
|
Dana Farber Cancer Institute
Completed comprehensive building HVAC and controls retro-commissioning for the entire campus.
| Scope: |
|
Complete HVAC and Controls Retro-Commissioning |
| Results: |
|
Retro-commissioned with a final operations and energy savings at a simple payback of 1.97 years and an IRR of 54% |
| |
|
|
Merritt Properties
Complete facility retro-commissioning for HVAC and building controls of office space:
Building 1 – 62,500 square feet Building 2 – 110,000 square feet |
| Scope: |
|
Complete Facility Retro-Commissioning HVAC and Controls |
| Results (Building 1): |
|
Retro-commissioned with a final operations and energy savings yielding a simple payback of 1.5 years at an IRR of 67% |
| Results (Building 2): |
|
Retro-commissioned with a final operations and energy savings yielding a simple payback of 2.4 years at an IRR of 42% |
| |
|
|
David S. Brown – Washington/Baltimore
ASHRAE Level One Assessment for LEED EB Qualification – Precursor to LEED EB Retro-Commissioning to commence August.
| Scope: |
|
Level One Assessment with pending RCX |
| Results: |
|
Assessment yielded energy savings with a simple payback of 2.6 years at an IRR of 38% |
| |
|
|

South Brunswick Schools
Facility Energy and Retro-Commissioning Study
Scope: Performed Energy and Retro-Commissioning assessment of school for energy/O&M optimization. Identified over energy savings at a projected return of 11% IRR.
Rider University
Energy Assessment and Master Planning
Scope: Comprehensive Energy Assessment of Lawrenceville and Westminster Campuses yielding energy savings at a projected return of 20% IRR.
Sheppard Pratt Health System
Campus Energy Assessment
Scope: Comprehensive Energy Assessment of main hospital campus identifying energy savings at a projected return of 26% IRR.
Princeton University
Energy Program Developer - Lighting
Scope: Energy Project Development and Management with responsibilities for the development and management of campus lighting retrofit program. Currently phases under management total 16 buildings.
Mutual Redevelopment Houses, New York, NY
Variable Frequency Drive Feasibility Study
Scope: Determined the cost effectiveness and technical feasibility of installing a Variable Frequency Drive (VFD) on supply air fans to optimize combustion air temperature for on-site cogeneration facility.
Ethicon, Inc., Somerville, NJ
Facility Energy and Operations Assessment
Scope: Assessed the material condition and operational effectiveness of major energy consuming system components in an effort to identify the highest payback operational enhancements that could be made at the campus. Overall goal was to drive down energy cost and CO2 emissions.
Utility Advantage, Egg Harbor Township, NJ
Atlanticare Health System Energy Audit
Scope: Performed initial energy audit to identify operational and capital improvements that would result in lower overall energy costs.
Harbour Square Condominiums, Washington, DC
Preliminary Energy Assessment
Scope: Performed preliminary energy assessment to gauge the availability of energy cost saving initiatives at this high end condominium complex.
Township of East Brunswick, New Jersey
Combined Heat and Power Analysis
Scope: Studied technical challenges and financial aspects of installing a combined heat and power facility at the East Brunswick Recreational Complex, slated for construction in late 2006.
United Color Manufacturing, Philadelphia, PA
Tax Relief Energy Audit
Scope: Performed a connected load study to determine the overall process load for both natural gas and electricity at the dye plant. Overall goal was to take advantage of tax relief as a manufacturing facility in the PECO service territory.
|
|
|
|
|