|
|
|

|

An investment grade step in determining your facility's energy cost savings options, ENERACTIVE's Comprehensive Facility Assessment (CFA) integrates a detailed energy study and operations assessment to provide thought provoking financials to help determine an energy strategy. This full-scale assessment considers all options, including an exploration of the latest technologies. Every measure analyzed and recommended by the CFA is developed to a conceptual level of design and budgeted for true energy performance and implementation cost.
The CFA is a fully detailed, complete analysis with solid economics illustrating returns on investment and financing options. CFA steps include:
|
|
|
Energy Information Analysis
- Analyzing all available energy data, including utility bills, plant logs, sub-metered data, BMS log info, previous studies and reports
- Developing an Energy Usage Index
- Determining field assessment focus points
Field Engineering and Auditing
- Physical building walkthrough with detailed assessment of the condition and operating characteristics of all energy consuming equipment
- Interviews with maintenance and operations personnel regarding equipment performance and reliability
- Equipment field testing, if necessary
Post Field Impact Assessment
- Developing a list of operational enhancements requiring minor maintenance or controls reconfiguring to implement (recommissioning measures)
- Developing a list of system modifications requiring equipment replacement
- All energy efficiency opportunities presented in a detailed list of Energy Conservation Measures (ECMs) that describe concept design, projected annual energy savings, and implementation costs. Each ECM includes substantiating energy calculations and preliminary equipment selections to provide additional fortification of the opportunity.
ENERACTIVE's CFA provides all of the decision making information necessary for allocating money for the implementation of energy efficiency improvements.
|
|
|